Concrete Testing Laboratory
Other Names: Cement Testing Laboratory
Date of Commission: 1927
Date of Occupancy: 1927
Other Dates in Building's History:
1927: The lab is "made of the old material of the boiler house" including the bricks, window frames and roof timbers.
1952: First floor remodeled for a chemical engineering machine shop. Eventually the space becomes offices for the chemistry department.
Donor(s): University
Other Agent(s): Matthews Construction Co. (builder of)
Materials: Red Brick
Function: Laboratory Spaces; Storeroom